WhatsApp
Follow Us:
Call Us: +91-9040701000 / 9114669555

Logistics

Global Marine Infrastructure, Engineering & International Multimodal Trade Solutions
CONNECTING OCEANS   |   POWERING TRADE   |   BUILDING TOMORROW   |   A STRONGER GLOBAL ECONOMY
PROJECT CARGO UNLOADING FROM A SHIP WITH TANDEM OPERATION

TOTAL LOGISTICS OPERATION - FROM CONCEPT TO DELIVERY

We offer end-to-end logistics management encompassing the entire supply chain from concept to final delivery.

Our scope includes:


  • Feasibility Studies: Comprehensive feasibility studies for movement of cargo via air, sea and surface, evaluating cost, time and risk parameters.
  • Procurement & Sourcing: Procurement of goods including heavy engineering goods, project cargo (ODC - Over Dimensional Cargo / OWC - Over Weight Cargo), loose bulk cargo and process raw materials for Gas, Chemical, Power, Ferrous and Non-Ferrous industries.
  • Chartering & Multimodal Transportation: Selection of suitable vessel chartering or part cargo, and choosing optimal multimodal transportation (Sea-Air-Road-Rail) as per requirement, ensuring safe and economical movement from Port of Origin till Port of Discharge.
  • Compliance & Documentation: The entire operation is executed abiding by the policies of trade bodies and international trade regulations, including customs, insurance, and statutory clearances, ensuring seamless and dispute-free delivery.



ODC, OWC & HYDRAULIC AXLE CONFIGURATION - SPECIALIZED PROJECT LOGISTICS1. ODC (Over Dimensional Cargo)
Cargo that exceeds the standard dimensions of normal container/trailer.

Example: Length > 12m, Width > 2.5m, Height > 2.5m, like Bridge Girders, Chimneys, Pressure Vessels for Power / Gas / Chemical Plants.2. OWC (Over Weight Cargo) Cargo that exceeds the permissible axle load limits for road transport.

Example: Weight > 40-49 MT on a single trailer, like Transformers (100-300 MT), Turbines, Heavy Reactors for Ferrous / Non-Ferrous.Often, ODC is also OWC.3. HYDRAULIC AXLE / HYDRAULIC MODULAR TRAILER (HMT / SPMT) CONFIGURATION For safe movement of ODC/OWC, we use Hydraulic Multi-Axle Trailers.How configuration is decided:A) Weight Distribution Study:Total Cargo Weight + Trailer Tare Weight = Gross WeightPermissible load per axle line = 12-18 MT (as per State RTO & MoRTH)No. of Axle Lines Required = Gross Weight / Permissible load per axle

Ex: 120 MT Transformer needs minimum 10-12 axle lines.B) Types of Configuration:8 Axle, 12 Axle, 16 Axle Hydraulic Trailer - For 60-150 MTModular Combination: 2x12 = 24 axles, 3x12 = 36 axles side-by-side (for 200-500 MT)SPMT (Self Propelled Modular Transporter): For in-plant movement / Port to jetty, up to 1000 MT+C) Critical Parameters for Feasibility:Turning Radius: Swing radius of ODC at curves.Axle Spacing & Load: To cross bridges - we provide Bridge Calculation & Bending Moment to PWD / NHAI.Height Clearance: Under HT lines, Flyovers, Toll Plazas.Road Width & Gradient: For Ghat sections.Puller / Pusher: Use of 2x Puller Tractors (450 HP) for heavy gradient.D) Permissions & Compliance:RTO - ODC Movement Permission from Origin & Transit StatesPWD / NHAI - Bridge & Road Stress AnalysisElectricity Board - Shutdown / Height clearancePolice Escort - For 24+ axle configurationMarine / Port Trust - If RO-RO / Barge movement required


Concinment with Hydraulic Axles on road

ODC/ OWC OPERATION ON RO-RO JETTY

Technical Analysis of the subject operation:

Cargo: Large Pressure Vessel / Reactor (Orange - Looks like for Chemical / Power / Gas plant) - ODC + OWCTrailer
Configuration: Hydraulic Axle Modular TrailerVisible Axle Lines: 8 Axle Lines (16 rows of wheels = 64 tyres)Type: 8 x 4 row - Hydraulic Low BedCapacity: Approx. 80 - 120 MT gross in this configurationSteering: All hydraulic axles are self-steering - can be seen turning for curves - critical for ODC feasibility.Lashing: Chain lashing + wooden saddles - as per international multimodal safety. What this proves for our consultancy: "Execution of ODC/OWC Project Cargo (Pressure Vessel) on 8-Axle Line Hydraulic Modular Trailer with full route feasibility, bridge load calculation and multimodal compliance as per specific requirement

Multimodal logistics combines air, sea, road, and rail transport into a single coordinated contract and flow to optimize speed, cost, and reliability.

Modes of Freight Transportation

  • Air Freight Used for high-value, sensitive, or urgent cargo when speed is the top priority.
  • Sea (Ocean) Freight Ideal for heavy, bulky, or high-volume international shipments across oceans at a lower cost.
  • Rail Freight Provides an efficient, sustainable, and high-capacity option for long-distance land transit.
  • Road (Trucking) Freight Offers the ultimate flexibility for crucial first-mile and last-mile door deliveries.

Core Benefits of Multimodal Integration

  • Cost Efficiency Balances expensive fast legs (air) with economical bulk legs (sea/rail) to cut overall shipping expenses by 10% to 20%.
  • Resilience Re-routes shipments smoothly via alternative pathways if a specific port or rail line faces congestion.
  • Sustainability Shifts long-haul heavy cargo away from congested highways to rail and maritime networks, lowering carbon emissions.
  • Unified Freight Contract Handled under a single unified freight forwarding contract, meaning you deal with one provider rather than coordinating multiple carriers independently.

Value Proposition

  • Reduced Logistics Costs Our specialized services are designed to identify and eliminate inefficiencies, leading to significant cost reductions in your overall logistics spend.
  • Faster & Reliable Delivery Streamlined processes and tailored solutions ensure your cargo moves swiftly and arrives on time, every time.
  • Real-Time Visibility Gain complete transparency throughout the logistics journey with our advanced operating systems. Monitor cargo’s location and status in real-time, allowing for informed decision-making.
  • Risk Management Our experienced team anticipates and mitigates potential risks associated with international shipping.


Logistic Feasibility studies

A logistics feasibility study across air, sea, and surface (road/rail) transport requires evaluating multiple operational vectors to find the ideal balance of cost, transit speed, and capacity.

A comprehensive visual framework breakdown, alongside direct comparisons and core components needed for a multimodal logistics analysis we adhere to following a matrix. Multimodal Transport Feasibility Matrix

When conducting a feasibility study, these key parameters dictate the choices between the core modes of transit.

Integrated Logistics Solutions

Turnkey Logistics Management for EPC Projects

In an EPC (Engineering, Procurement & Construction) project, logistics is not a separate activity; it is the backbone of the entire project lifecycle. Professional logistics ensures that critical equipment reaches site safely, compliantly and exactly when erection requires it.

Hydraulic multi-axle transport for refinery project cargo

1. Petrochemical & Refinery

  • Transportation of distillation columns, pressure vessels, heat exchangers and reactors (ODC/OWC) on hydraulic multi-axle trailers.
  • Heavy-haul feasibility studies from port of origin to refinery site.
  • Hazardous chemical handling with PESO and DG compliance.
Heavy project cargo movement for power plant equipment

2. Power Plant — Thermal, Gas & Hydro

  • Movement of turbines, generators, transformers (100–350 MT), boilers and cooling towers.
  • Specialized 12/16/20 axle-line configurations with puller-pusher arrangements for gradients.
  • Route surveys, bridge-load calculations, NHAI/PWD approvals and HT-line shutdown coordination.
Project cargo handling for metal industry logistics

3. Ferrous & Non-Ferrous Metals

  • Movement of copper cathodes, wire-rod coils, transformers and process reactor vessels.
  • Iron ore, coal and alumina logistics through vessel chartering and rail-road multimodal movement.
  • Secure movement of steel coils, plates and billets with correct lashing and restraint.
ODC logistics for process gas chemical and fertilizer plants

4. Process Gas, Chemical & Fertilizer Plants

  • ODC movement of reactor vessels, chimneys and storage tanks with police escort and RTO permissions.
  • International procurement support, EXIM/DGFT compliance and EPCG benefit coordination.

Our Scope Under EPC

  • Pre-bid feasibility: Route survey, cost estimation, axle-configuration chart and permit list.
  • Engineering: Load distribution, lashing scheme and centre-of-gravity study.
  • Procurement logistics: Vendor-to-port transport, customs clearance and break-bulk/Ro-Ro vessel booking.
  • Project transportation: Port-to-site movement by hydraulic axle, barge and rail.
  • Site handling: Offloading and erection support with high-capacity cranes up to 500 MT.
  • Compliance: Full adherence to INCOTERMS, EXIM Policy, DGFT and Port Trust regulations.

Value Addition: We save 12–15% of total EPC cost through optimized axle configuration, multimodal shifts, avoided demurrage and just-in-time delivery for erection.

ENGINEERING MOVES ON LOGISTICS — WE DELIVER YOUR EPC, FROM PORT OF ORIGIN TO FOUNDATION.


Our objective is to provide a single-window, cost-effective and time-bound logistics solution with complete risk mitigation.